Votre e-mail a été envoyé.
WARNER ROAD & HIGHWAY 17 S Lot | Terrain industriel | 160,91 ha | À vendre | Green Cove Springs, FL 32043

Certaines informations ont été traduites automatiquement.
INFORMATIONS PRINCIPALES SUR L'INVESTISSEMENT
- Railroad
- Heavy Power
RÉSUMÉ ANALYTIQUE
± 315.61 Acres Net of Conservation Easement
CSX Mainline Switch Still in Place: Track in Need of Rehab
Clay County Electric CO-OP: Currently 7MW with Ability to Increase
Zoning: Light Industrial
Project Supported by CSX Railroad
Location
± 6 Miles South of the First Coast Expressway
± 30 Miles South of Downtown Jacksonville
± 35 Miles South of the Port of Jacksonville
± 42 Miles South of Jacksonville Airport
Pricing: Call Broker for Pricing (Based Upon Acreage Net of Conservation Easement)
INFORMATIONS SUR L’IMMEUBLE
| Type de vente | Investissement ou propriétaire occupant | Sous-type de bien | Terrain industriel |
| Nb de lots | 1 | Usage proposé | |
| Type de bien | Terrain | Surface totale du lot | 160,91 ha |
| Type de vente | Investissement ou propriétaire occupant |
| Nb de lots | 1 |
| Type de bien | Terrain |
| Sous-type de bien | Terrain industriel |
| Usage proposé | |
| Surface totale du lot | 160,91 ha |
1 LOT DISPONIBLE
Lot
| Surface du lot | 160,91 ha |
| Surface du lot | 160,91 ha |
TOTAL SIZE: ± 397.61 Gross Acres ± 315.61 Acres Net of Conservation Easement CSX Mainline Switch Still in Place: Track in Need of Rehab Clay County Electric CO-OP: Currently 7MW with Ability to Increase Zoning: Light Industrial
DESCRIPTION
TOTAL SIZE: ± 397.61 Gross Acres ± 315.61 Acres Net of Conservation Easement CSX Mainline Switch Still in Place: Track in Need of Rehab Clay County Electric CO-OP: Currently 7MW with Ability to Increase Zoning: Light Industrial Project Supported by CSX Railroad Location ± 6 Miles South of the First Coast Expressway ± 30 Miles South of Downtown Jacksonville ± 35 Miles South of the Port of Jacksonville ± 42 Miles South of Jacksonville Airport Pricing: Call Broker for Pricing (Based Upon Acreage Net of Conservation Easement)
TAXES FONCIÈRES
| N° de parcelle | Évaluation des aménagements | 0 € | |
| Évaluation du terrain | 426 506 € | Évaluation totale | 959 316 € |
TAXES FONCIÈRES
Présenté par
WARNER ROAD & HIGHWAY 17 S
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.
