Connectez-vous/S’inscrire
Votre e-mail a été envoyé.
Certaines informations ont été traduites automatiquement.
INFORMATIONS PRINCIPALES SUR L'INVESTISSEMENT
- Includes river views
- Close proximity to Broughty Ferry railway station
- Redevelopment potential
RÉSUMÉ ANALYTIQUE
This is a prime opportunity to purchase a development site in Broughty Ferry. The site extends to 0.47 hectares (1.16 acres) and is split into three areas, identified in red on the plan. The areas are linked by retained land over which the purchaser will have a right of servitude. The main part of the site comprises an area enclosed by a combination of 2.5 metre high walls and fences – referred to as the “Screenings Compound”. Within this Compound are four former screening chamber buildings that were erected in the late 1980’s, three of which are redundant. The remaining building remains live and forms part of the Tay Wastewater Project and this part of the site, including the building, is leased by Scottish Water. Pipe protection zones are also indicated on the plan and further details on these can be provided.
Within the Dundee Local Development Plan (adopted February 2019), the majority of the site is unallocated meaning any development proposals would be subject to the relevant land use based policies of the LDP. Parts of the site along the south and south-western boundaries are zoned under Policy 28: Protecting and Enhancing the Dundee Green Network and Policy 33: Local Nature Conservation Designations.
Within the Dundee Local Development Plan (adopted February 2019), the majority of the site is unallocated meaning any development proposals would be subject to the relevant land use based policies of the LDP. Parts of the site along the south and south-western boundaries are zoned under Policy 28: Protecting and Enhancing the Dundee Green Network and Policy 33: Local Nature Conservation Designations.
INFORMATIONS SUR L’IMMEUBLE
| Type de vente | Investissement | Classe d’immeuble | C |
| Condition de vente | Projet de requalification | Surface du lot | 0,47 ha |
| Droit d’usage | Pleine propriété | Surface de l’immeuble | 967 m² |
| Type de bien | Spécialité | Nb d’étages | 1 |
| Sous-type de bien | Installation de traitement de l’eau | Année de construction | 1980 |
| Type de vente | Investissement |
| Condition de vente | Projet de requalification |
| Droit d’usage | Pleine propriété |
| Type de bien | Spécialité |
| Sous-type de bien | Installation de traitement de l’eau |
| Classe d’immeuble | C |
| Surface du lot | 0,47 ha |
| Surface de l’immeuble | 967 m² |
| Nb d’étages | 1 |
| Année de construction | 1980 |
1 1
1 sur 2
VIDÉOS
VISITE EXTÉRIEURE 3D MATTERPORT
VISITE 3D
PHOTOS
STREET VIEW
RUE
CARTE
1 sur 1
Présenté par
Panmurefield | Panmurefield Rd
Vous êtes déjà membre ? Connectez-vous
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.

