Connectez-vous/S’inscrire
Votre e-mail a été envoyé.
Certaines informations ont été traduites automatiquement.
INFORMATIONS PRINCIPALES SUR L'INVESTISSEMENT
- New Alameda Road Frontage
- Located just North of Deer Valley Airport Access to 3 Full Diamond Interchanged on I-17 on Loop 101 Freeway
- Less than 5 miles from the $40 billion state-of-the-art Taiwan Semiconductor Manufacturing Plant
RÉSUMÉ ANALYTIQUE
Taiwan Semiconductor Manufacturing Co. (TSMC) is building the massive chip-making facility on a large 1129 acres of land, with an even larger $12 billion investment. TSMC’s new facility is near Interstate 17 and Loop 303, which the Taiwanese giant purchased back in December 2020.
The new facility in Arizona should be operational by 2024. “Structural construction of the fabrication facility, called the fab, is nearing completion, and the office building has about half of its glasswork completed., there are currently 38 cranes working on the massive site”.
TSMC is training around 500 employees from Arizona, over in Taiwan right now where TSMC has its feet firmly planted. But in 2023, TSMC is expected to have over 2000 people working in the Arizona plant.
Another positive for the US is that the existing semiconductor industry in Arizona has pulled the attention of other semiconductor industry companies to focus on Arizona, ever since TSMC announced its plans for the plant in Arizona.
The new facility in Arizona should be operational by 2024. “Structural construction of the fabrication facility, called the fab, is nearing completion, and the office building has about half of its glasswork completed., there are currently 38 cranes working on the massive site”.
TSMC is training around 500 employees from Arizona, over in Taiwan right now where TSMC has its feet firmly planted. But in 2023, TSMC is expected to have over 2000 people working in the Arizona plant.
Another positive for the US is that the existing semiconductor industry in Arizona has pulled the attention of other semiconductor industry companies to focus on Arizona, ever since TSMC announced its plans for the plant in Arizona.
INFORMATIONS SUR L’IMMEUBLE
| Type de vente | Investissement ou propriétaire occupant | Sous-type de bien | Terrain industriel |
| Nb de lots | 1 | Usage proposé | Lots d’appartement |
| Type de bien | Terrain | Surface totale du lot | 1,13 ha |
| Zonage | R-43 - R-43, Residential | ||
| Type de vente | Investissement ou propriétaire occupant |
| Nb de lots | 1 |
| Type de bien | Terrain |
| Sous-type de bien | Terrain industriel |
| Usage proposé | Lots d’appartement |
| Surface totale du lot | 1,13 ha |
| Zonage | R-43 - R-43, Residential |
1 LOT DISPONIBLE
Lot
| Surface du lot | 1,13 ha |
| Surface du lot | 1,13 ha |
1 1
TAXES FONCIÈRES
| N° de parcelle | Évaluation des aménagements | 0 € | |
| Évaluation du terrain | 21 122 € | Évaluation totale | 21 122 € |
TAXES FONCIÈRES
N° de parcelle
Évaluation du terrain
21 122 €
Évaluation des aménagements
0 €
Évaluation totale
21 122 €
1 sur 2
VIDÉOS
VISITE EXTÉRIEURE 3D MATTERPORT
VISITE 3D
PHOTOS
STREET VIEW
RUE
CARTE
1 sur 1
Présenté par
NEC Alameda Rd & 11th Ave
Vous êtes déjà membre ? Connectez-vous
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.

