INFORMATIONS PRINCIPALES
- 3 Phase Electricity.
- Pedestrian Entrance.
- Panasonic Heat Pump and A/C System.
- X3 Car Parking.
- Roller Shutter (2.3m High).
- LED Lighting.
- Openreach Broadband Connection.
TOUS LES ESPACES DISPONIBLES(2)
Afficher les loyers en
- ESPACE
- SURFACE
- DURÉE
- LOYER
- TYPE DE BIEN
- ÉTAT
- DISPONIBLE
The main section of the units is of steel portal frame construction with profile cladding under a pitched roof with plentiful roof lights. In addition, each unit has a cleverly incorporated shipping container, connected internally to the main unit to provide additional workspace. Unit 12 benefits from roller shutter doors, 3 phase electricity, LED lighting, heat pump and air conditioning. Operational use limitations Monday–Saturday 7am–7pm. (No use on Sundays or statutory holidays).
- Classe d’utilisation : B2
- Classe de performance énergétique –B
- Panasonic Heat Pump and A/C System
- Comprend 30 m² d’espace de bureau dédié
- Pedestrian Entrance
- 3 Phase Electricity
The main section of the units is of steel portal frame construction with profile cladding under a pitched roof with plentiful roof lights. In addition, each unit has a cleverly incorporated shipping container, connected internally to the main unit to provide additional workspace Operational use limitations Monday–Saturday 7am–7pm. (No use on Sundays or statutory holidays).
- Classe d’utilisation : B8
- Climatisation centrale
- Classe de performance énergétique –B
- Pitched roof with plentiful roof lights
- Comprend 28 m² d’espace de bureau dédié
- Stores automatiques
- LED Lighting
- Pedestrian Entrance
| Espace | Surface | Durée | Loyer | Type de bien | État | Disponible |
| RDC – 12 | 126 m² | Négociable | 237,97 € /m²/an 19,83 € /m²/mois 29 935 € /an 2 495 € /mois | Industriel/Logistique | - | Maintenant |
| RDC – 3 | 96 m² | Négociable | 236,99 € /m²/an 19,75 € /m²/mois 22 766 € /an 1 897 € /mois | Local d’activités | Construction partielle | Maintenant |
RDC – 12
| Surface |
| 126 m² |
| Durée |
| Négociable |
| Loyer |
| 237,97 € /m²/an 19,83 € /m²/mois 29 935 € /an 2 495 € /mois |
| Type de bien |
| Industriel/Logistique |
| État |
| - |
| Disponible |
| Maintenant |
RDC – 3
| Surface |
| 96 m² |
| Durée |
| Négociable |
| Loyer |
| 236,99 € /m²/an 19,75 € /m²/mois 22 766 € /an 1 897 € /mois |
| Type de bien |
| Local d’activités |
| État |
| Construction partielle |
| Disponible |
| Maintenant |
RDC – 12
| Surface | 126 m² |
| Durée | Négociable |
| Loyer | 237,97 € /m²/an |
| Type de bien | Industriel/Logistique |
| État | - |
| Disponible | Maintenant |
The main section of the units is of steel portal frame construction with profile cladding under a pitched roof with plentiful roof lights. In addition, each unit has a cleverly incorporated shipping container, connected internally to the main unit to provide additional workspace. Unit 12 benefits from roller shutter doors, 3 phase electricity, LED lighting, heat pump and air conditioning. Operational use limitations Monday–Saturday 7am–7pm. (No use on Sundays or statutory holidays).
- Classe d’utilisation : B2
- Comprend 30 m² d’espace de bureau dédié
- Classe de performance énergétique –B
- Pedestrian Entrance
- Panasonic Heat Pump and A/C System
- 3 Phase Electricity
RDC – 3
| Surface | 96 m² |
| Durée | Négociable |
| Loyer | 236,99 € /m²/an |
| Type de bien | Local d’activités |
| État | Construction partielle |
| Disponible | Maintenant |
The main section of the units is of steel portal frame construction with profile cladding under a pitched roof with plentiful roof lights. In addition, each unit has a cleverly incorporated shipping container, connected internally to the main unit to provide additional workspace Operational use limitations Monday–Saturday 7am–7pm. (No use on Sundays or statutory holidays).
- Classe d’utilisation : B8
- Comprend 28 m² d’espace de bureau dédié
- Climatisation centrale
- Stores automatiques
- Classe de performance énergétique –B
- LED Lighting
- Pitched roof with plentiful roof lights
- Pedestrian Entrance
APERÇU DU BIEN
HQUBE is located in Broom Way behind the Morrisons Superstore, just outside the main town centre, which has an extensive range of retail and leisure facilities. High Wycombe is strategically located on the M40 Motorway (J4) 30 miles west of Central London, and excellent road communications are available to other principal towns in the greater Thames Valley region. Excellent rail services High Wycombe to London Marylebone with journey time of approximately 29 minutes.
FAITS SUR L’INSTALLATION ENTREPÔT
OCCUPANTS
- ÉTAGE
- NOM DE L’OCCUPANT
- SECTEUR D’ACTIVITÉ
- RDC
- Chiltern Air Management
- Services
- RDC
- Compair UK
- Manufacture
Présenté par
HQube | Bellfield Rd
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.