Votre e-mail a été envoyé.
Certaines informations ont été traduites automatiquement.
INFORMATIONS PRINCIPALES SUR L'INVESTISSEMENT
- 2,100 +/- rail frontage w/ potential for rail spur
- Public water, sewer and 3-phase power available
- Central Piedmont location along the US-74 industrial corridor
INFORMATIONS SUR L’IMMEUBLE
| Prix | 4 426 760 € | Sous-type de bien | Terrain industriel |
| Type de vente | Investissement ou propriétaire occupant | Usage proposé | Industriel/Logistique |
| Nb de lots | 1 | Surface totale du lot | 33,59 ha |
| Type de bien | Terrain | ||
| Zonage | HI & R-20 - Heavy Industrial district is intended to provide manufacturing, warehousing, and similar uses. | ||
| Prix | 4 426 760 € |
| Type de vente | Investissement ou propriétaire occupant |
| Nb de lots | 1 |
| Type de bien | Terrain |
| Sous-type de bien | Terrain industriel |
| Usage proposé | Industriel/Logistique |
| Surface totale du lot | 33,59 ha |
| Zonage | HI & R-20 - Heavy Industrial district is intended to provide manufacturing, warehousing, and similar uses. |
1 LOT DISPONIBLE
Lot
| Prix | 4 426 760 € | Surface du lot | 33,59 ha |
| Prix par ha | 131 792,32 € |
| Prix | 4 426 760 € |
| Prix par ha | 131 792,32 € |
| Surface du lot | 33,59 ha |
DESCRIPTION
Prime 83± acre industrial site within the Wadesboro city limits featuring HI and R-20 zoning, located just 1 mile from US-74. Wadesboro, NC offers a strategic Central Piedmont location along the US-74 industrial corridor with quick access to Charlotte. This corridor serves as the primary east–west route connecting Charlotte to Wilmington and the Port of Wilmington. The property includes 2,100± ft of CSX rail frontage with potential for a rail spur and is only 0.5 miles from the WSS CSX interchange. Water and sewer provided by the Town of Wadesboro are available along Airport Road, and 3-phase power by Duke Energy is also accessible along Airport Road, creating an excellent opportunity for industrial, logistics, or rail-served development. Located just 20 miles east of Amazon Web Services’ new $10 billion AI and cloud-infrastructure campus.
Présenté par
Airport Rd
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.




