River Ridge Battery Energy Storage System 950 County Road 204 Lot | Terrain commercial | 6,47 ha | À vendre | 3 404 360 € | Colorado City, TX 79512

Certaines informations ont été traduites automatiquement.
RÉSUMÉ ANALYTIQUE
A 16.0 Acre site, fee simple, including minerals with executive rights and wind rights on I-20, surrounded by 300 MW data centers (3), which are presently under construction and immediately adjacent within 100 yards of a major substation, providing power to over 1,000 acres of incoming data centers and bitcoin mining facilities. Perfect fit for a 100 MW Battery Energy Storage System. The Site is located 100 yards from a newly upgraded Oncor Substation (Barber Lake). All transmission lines are in place, surrounded by $ 450 million of Data, Artificial Intelligence and Bitcoin mining facilities backed by Soft Bank, a portion of the The Stargate project in Abilene, Texas, a massive, $500 billion initiative to build a supercluster of data centers for OpenAI.
INFORMATIONS SUR L’IMMEUBLE
| Prix | 3 404 360 € | Type de bien | Terrain |
| Type de vente | Investissement ou propriétaire occupant | Sous-type de bien | Terrain commercial |
| Condition de vente | Ventes de portefeuille | Usage proposé | Commercial |
| Nb de lots | 1 | Surface totale du lot | 6,47 ha |
| Prix | 3 404 360 € |
| Type de vente | Investissement ou propriétaire occupant |
| Condition de vente | Ventes de portefeuille |
| Nb de lots | 1 |
| Type de bien | Terrain |
| Sous-type de bien | Terrain commercial |
| Usage proposé | Commercial |
| Surface totale du lot | 6,47 ha |
1 LOT DISPONIBLE
Lot
| Prix | 3 404 360 € | Surface du lot | 6,47 ha |
| Prix par ha | 525 772,31 € |
| Prix | 3 404 360 € |
| Prix par ha | 525 772,31 € |
| Surface du lot | 6,47 ha |
16.0 Acre site, fee simple, including mineral and wind rights with executive rights on Iinterstate 20, major intersection, surrounded by 300 MW data centers (3), for 900 MW capacity, vacant land with 20 MW power daily to site
1 1
1 sur 2
VIDÉOS
VISITE EXTÉRIEURE 3D MATTERPORT
VISITE 3D
PHOTOS
STREET VIEW
RUE
CARTE
1 sur 1
Présenté par
Mentor Properties Ltd.
River Ridge Battery Energy Storage System | 950 County Road 204
Vous êtes déjà membre ? Connectez-vous
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.