Connectez-vous/S’inscrire
Votre e-mail a été envoyé.
Hanon Street Apartments 9 Hannon St Immeuble residentiel 16 lots 5 058 728 € (316 170 €/Lot) Taux de capitalisation 6,97 % Boston, MA 02124



Certaines informations ont été traduites automatiquement.
Informations principales sur l'investissement
- Area Amenities & Demand Drivers
- Desirable Brick Construction
- Strong Rental Demographics & Demand
- Nearby Higher Education
- Off-Street Parking
- Quality of Life Amenities
Résumé analytique
Horvath & Tremblay is pleased to present the exclusive opportunity to purchase the multi-family investment property located at 9 Hannon Street in Dorchester, MA (the “Property”). The four-story brick building contains fifteen (15) 2-Bedroom/1-Bathroom units and one (1) 1-Bedroom/1- Bathroom unit with 14,720 square feet of gross living area in 14,720 square feet of gross area. The Property is situated upon a 0.22-acre parcel and features over eight (8+) off-street parking spaces. The units, which feature luxury vinyl plank flooring, updated kitchens with granite counter tops and updated bathrooms with tile flooring and a tiled shower. The Property also offers an on-site laundry facility. Hannon Street Apartments offers the opportunity to acquire a well-maintained investment property with upside in an exceptional, urban-infill location. The subject property is ideal for a potential buyer looking for income growth and strong investment returns.
The Property is ideally situated in the Dorchester neighborhood of Boston, steps away from the Morton Street MBTA Commuter Rail Station, also providing residents with convenient access to the Red and Orange MBTA Commuter Rails. The property benefits from proximity to major transportation corridors including Interstate 93, Morrissey Boulevard, and Columbia Road, providing efficient connectivity to Downtown Boston, the Seaport District, Cambridge, and the greater metropolitan area.
The Property is ideally situated in the Dorchester neighborhood of Boston, steps away from the Morton Street MBTA Commuter Rail Station, also providing residents with convenient access to the Red and Orange MBTA Commuter Rails. The property benefits from proximity to major transportation corridors including Interstate 93, Morrissey Boulevard, and Columbia Road, providing efficient connectivity to Downtown Boston, the Seaport District, Cambridge, and the greater metropolitan area.
Informations sur l’immeuble
| Prix | 5 058 728 € | Style d’appartement | De hauteur moyenne |
| Prix par lot | 316 170 € | Classe d’immeuble | C |
| Type de vente | Investissement | Surface du lot | 0,04 ha |
| Taux de capitalisation | 6,97 % | Surface de l’immeuble | 1 368 m² |
| Nb de lots | 16 | Nb d’étages | 4 |
| Type de bien | Immeuble residentiel | Année de construction | 1965 |
| Sous-type de bien | Appartement | Ratio de stationnement | 0,05/1 000 m² |
| Zonage | A | ||
| Prix | 5 058 728 € |
| Prix par lot | 316 170 € |
| Type de vente | Investissement |
| Taux de capitalisation | 6,97 % |
| Nb de lots | 16 |
| Type de bien | Immeuble residentiel |
| Sous-type de bien | Appartement |
| Style d’appartement | De hauteur moyenne |
| Classe d’immeuble | C |
| Surface du lot | 0,04 ha |
| Surface de l’immeuble | 1 368 m² |
| Nb d’étages | 4 |
| Année de construction | 1965 |
| Ratio de stationnement | 0,05/1 000 m² |
| Zonage | A |
1 1
Moyennement praticable à pied
70/100
Relativement adapté aux voitures
50/100
Transports en commun robustes
80/100
Moyennement praticable en vélo
60/100
Taxes foncières
| N° de parcelle | Évaluation des aménagements | 907 962 € | |
| Évaluation du terrain | 467 660 € | Évaluation totale | 1 375 622 € |
Taxes foncières
N° de parcelle
Évaluation du terrain
467 660 €
Évaluation des aménagements
907 962 €
Évaluation totale
1 375 622 €
1 sur 10
Vidéos
Visite extérieure 3D Matterport
Visite 3D
Photos
Street view
Rue
Carte
1 sur 1
Présenté par
Hanon Street Apartments | 9 Hannon St
Vous êtes déjà membre ? Connectez-vous
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.
