Votre e-mail a été envoyé.
Certaines informations ont été traduites automatiquement.
Informations principales
- Turnkey industrial outdoor storage (IOS) site available August 1, 2026.
- Gross lease structure at $10,000/month with no NNN pass-through expenses.
- Strategic location along the Alico Road corridor with convenient access to I-75 and US-41.
- ±1.13-acre fully fenced and gated yard with secure controlled access.
- Designed to accommodate heavy equipment, fleet vehicles, and outdoor material storage.
Caractéristiques
Tous les espace disponibles(1)
Afficher les loyers en
- Espace
- Surface
- Durée
- Loyer
- Type de bien
- Aménagement
- Disponible
- Le loyer comprend les services publics, les services de l’immeuble et les frais immobiliers.
| Espace | Surface | Durée | Loyer | Type de bien | Aménagement | Disponible |
| 1er étage | 204 m² | 3 Ans | 505,50 € /m²/an 42,12 € /m²/mois 103 317 € /an 8 610 € /mois | Industriel/Logistique | - | Maintenant |
1er étage
| Surface |
| 204 m² |
| Durée |
| 3 Ans |
| Loyer |
| 505,50 € /m²/an 42,12 € /m²/mois 103 317 € /an 8 610 € /mois |
| Type de bien |
| Industriel/Logistique |
| Aménagement |
| - |
| Disponible |
| Maintenant |
1er étage
| Surface | 204 m² |
| Durée | 3 Ans |
| Loyer | 505,50 € /m²/an |
| Type de bien | Industriel/Logistique |
| Aménagement | - |
| Disponible | Maintenant |
- Le loyer comprend les services publics, les services de l’immeuble et les frais immobiliers.
Aperçu du bien
8181 Mainline Parkway is a turnkey, move-in ready outdoor storage site in along the Alico Road corridor. The site is enclosed by a secure perimeter fence with gated access, giving tenants full control over yard security and asset protection. A manufactured office delivers immediate administrative space on site, while the covered work area allows operations to continue through Florida‘s heat and seasonal rain without the cost of permanent construction. The property‘s standout feature is its fully stabilized concrete base - a meaningful operational advantage in a market where most competing yards are gravel or compacted fill. The concrete surface eliminates erosion, mud, and maintenance costs while supporting heavy equipment, fleet vehicles, and material staging year-round. Available at $10,000/month Gross - a single all-in payment with no NNN pass-through exposure.
Faits sur l’installation Industriel/Logistique
Présenté par
8181 Mainline Pky
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.




