Connectez-vous/S’inscrire
Votre e-mail a été envoyé.
Certaines informations ont été traduites automatiquement.
INFORMATIONS PRINCIPALES SUR L'INVESTISSEMENT
- 4MW of Electrical Service
- Rail Service
- Chemical Bulk Storage
RÉSUMÉ ANALYTIQUE
Built in 1995 with an expansion in 2009, the facility is strategically located just minutes from US Highway 311, which connects Danville, VA to Winston-Salem, NC and links to US Highway 220, a key north-south corridor through central North Carolina.
The property is equipped with numerous specialized and hard-to-replace infrastructure features, including 4MW of electrical service, steam boilers, water chillers, compressed air systems, chemical bulk storage and rail service. These built-in capabilities make the facility ideally suited for intensive manufacturing operations. With it scale, infrastructure, and strategic location, this property represents a rare and valuable industrial opportunity in the southeastern United States.
The property is equipped with numerous specialized and hard-to-replace infrastructure features, including 4MW of electrical service, steam boilers, water chillers, compressed air systems, chemical bulk storage and rail service. These built-in capabilities make the facility ideally suited for intensive manufacturing operations. With it scale, infrastructure, and strategic location, this property represents a rare and valuable industrial opportunity in the southeastern United States.
TAXES ET FRAIS D’EXPLOITATION (RÉEL - 2025) Cliquez ici pour accéder à |
ANNUEL | ANNUEL PAR m² |
|---|---|---|
| Taxes |
-
|
-
|
| Frais d’exploitation |
-
|
-
|
| Total des frais |
$99,999
|
$9.99
|
TAXES ET FRAIS D’EXPLOITATION (RÉEL - 2025) Cliquez ici pour accéder à
| Taxes | |
|---|---|
| Annuel | - |
| Annuel par m² | - |
| Frais d’exploitation | |
|---|---|
| Annuel | - |
| Annuel par m² | - |
| Total des frais | |
|---|---|
| Annuel | $99,999 |
| Annuel par m² | $9.99 |
INFORMATIONS SUR L’IMMEUBLE
CARACTÉRISTIQUES
- Terrain clôturé
- Système de sécurité
SERVICES PUBLICS
- Éclairage
- Gaz
- Eau - Ville
- Égout - Ville
- Chauffage
1 1
TAXES FONCIÈRES
| Numéro de parcelle | 110534 | Évaluation des aménagements | 11 517 263 € |
| Évaluation du terrain | 427 625 € | Évaluation totale | 11 944 888 € |
TAXES FONCIÈRES
Numéro de parcelle
110534
Évaluation du terrain
427 625 €
Évaluation des aménagements
11 517 263 €
Évaluation totale
11 944 888 €
1 sur 17
VIDÉOS
VISITE EXTÉRIEURE 3D MATTERPORT
VISITE 3D
PHOTOS
STREET VIEW
RUE
CARTE
1 sur 1
Présenté par
816 W Fieldcrest Rd
Vous êtes déjà membre ? Connectez-vous
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.



