Connectez-vous/S’inscrire
Votre e-mail a été envoyé.
Certaines informations ont été traduites automatiquement.
Informations principales sur l'investissement
- ±257-acre site with direct access to multiple 345kV transmission lines and ITC/DTE Energy infrastructure.
- Zoned for mixed-use and industrial applications, including data processing and computing centers.
- All major utilities on-site, including electric, gas, water, sanitary, and fiber from multiple providers.
- Power capacity of 240MW available by 2028, scalable to 1GW for long-term growth.
- Immediate access to I-75 and I-275, with connectivity to the Gordie Howe and Ambassador Bridges.
- Adjacent to Meijer Distribution Center and near major logistics and industrial corridors.
Résumé analytique
This ±257-acre site in Newport, Michigan, offers a premier opportunity for large-scale data center development with direct access to robust power infrastructure and fiber connectivity. Strategically located near the I-75 and I-275 interchange, the property provides seamless access to major transportation routes, including the Gordie Howe International Bridge, Ambassador Bridge, and the Port of Monroe, supporting both national and international connectivity.
The site is adjacent to the Meijer Distribution Center and benefits from proximity to major industrial and logistics hubs. Zoned for mixed-use and industrial/agricultural purposes, the property accommodates data processing and computing centers as permitted uses. With multiple 345kV transmission lines on-site, the property can deliver up to 240MW by 2028 and scale to 1GW, making it ideal for hyperscale or enterprise data center operations. All utilities, including electric, gas, water, sanitary, and fiber services, are available, and the flat topography supports efficient development. This location combines power availability, fiber access, and transportation advantages, positioning it as a leading choice for mission-critical infrastructure investment.
The site is adjacent to the Meijer Distribution Center and benefits from proximity to major industrial and logistics hubs. Zoned for mixed-use and industrial/agricultural purposes, the property accommodates data processing and computing centers as permitted uses. With multiple 345kV transmission lines on-site, the property can deliver up to 240MW by 2028 and scale to 1GW, making it ideal for hyperscale or enterprise data center operations. All utilities, including electric, gas, water, sanitary, and fiber services, are available, and the flat topography supports efficient development. This location combines power availability, fiber access, and transportation advantages, positioning it as a leading choice for mission-critical infrastructure investment.
Informations sur l’immeuble
| Type de vente | Investissement | Sous-type de bien | Terrain commercial |
| Nb de lots | 1 | Surface totale du lot | 104 ha |
| Type de bien | Terrain | ||
| Zonage | MU/AG-(1) - Mixed-Use Berlin Township/Industrial agricultural Frenchtown Township | ||
| Type de vente | Investissement |
| Nb de lots | 1 |
| Type de bien | Terrain |
| Sous-type de bien | Terrain commercial |
| Surface totale du lot | 104 ha |
| Zonage | MU/AG-(1) - Mixed-Use Berlin Township/Industrial agricultural Frenchtown Township |
1 Lot disponible
Lot
| Surface du lot | 104 ha |
| Surface du lot | 104 ha |
All utilities available at the site. Environmental Report Phase I & II (2023) - For the 20.92 AC/86.03 AC only. Possible state incentives available.
1 1
Not walkable
10/100
Exceptionally drivable
100/100
Somewhat bikeable
30/100
1 sur 2
Vidéos
Visite extérieure 3D Matterport
Visite 3D
Photos
Street view
Rue
Carte
1 sur 1
Présenté par
7934 Newport South Rd
Vous êtes déjà membre ? Connectez-vous
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.

