Connectez-vous/S’inscrire
Votre e-mail a été envoyé.
6606 S County Road 213
Deer Trail, CO 80105
Deer Trail Pit · Terrain À vendre
·
26,91 ha


Certaines informations ont été traduites automatiquement.
Informations principales sur l'investissement
- Permitted Gravel Pit – Active site with mining permit in place.
- Significant Reserves – Estimated at ~2 million tons of aggregate material
- Prime Location – Just 1.75 miles from Deer Trail and the Union Pacific Railroad.
- Sale includes the real estate, mineral & water rights, the business, and equipment.
- Permitted 14 AF/ YR water included
Résumé analytique
Permitted, active gravel pit located just 1.75 miles from the I-70 exit at the Town of Deer Trail and the Union Pacific Railroad. A geologic survey estimates 1.2 million cubic yards / 1,800,000 tons of Concrete Sand Material and other Marketable aggregates to be mined.
-Permitted Gravel Pit – Active site with mining permit in place.
-Approved Reclamation Plan and permit in place, including 8,000 CY ($430,000) of additional topsoil required by the State of Colorado has been imported and
stockpiled on site.
-15 feet of Overburden (363,000 CY) has been removed from Phase 1,2,3 and stockpiled for future Reclamation. ($989,250).
-Sale includes real estate, mineral & water rights, business, and equipment.
-Commercial Well drilled at 625 feet and pumps 300 GPM into two lined Ponds/water storage ($280,000) for washing materials throughout the duration of all Seven Mining Phases. (25 Years).
-Significant Reserves – Estimated by CTL Thomspon Engineering report at ~1. 2 million Cubic yards / 1,800,000 tons of aggregate material.
-Permitted 14 AF / YR water & 1,400 AF / 100 YR.
-Prime Location – Just 1.75 miles from Deer Trail and the Union Pacific Railroad.
-Excellent Access – Only 2 miles from I-70 exit 328 and approximately 40 miles from I-70/E-470 and 30 miles from Limon.
-Permitted Gravel Pit – Active site with mining permit in place.
-Approved Reclamation Plan and permit in place, including 8,000 CY ($430,000) of additional topsoil required by the State of Colorado has been imported and
stockpiled on site.
-15 feet of Overburden (363,000 CY) has been removed from Phase 1,2,3 and stockpiled for future Reclamation. ($989,250).
-Sale includes real estate, mineral & water rights, business, and equipment.
-Commercial Well drilled at 625 feet and pumps 300 GPM into two lined Ponds/water storage ($280,000) for washing materials throughout the duration of all Seven Mining Phases. (25 Years).
-Significant Reserves – Estimated by CTL Thomspon Engineering report at ~1. 2 million Cubic yards / 1,800,000 tons of aggregate material.
-Permitted 14 AF / YR water & 1,400 AF / 100 YR.
-Prime Location – Just 1.75 miles from Deer Trail and the Union Pacific Railroad.
-Excellent Access – Only 2 miles from I-70 exit 328 and approximately 40 miles from I-70/E-470 and 30 miles from Limon.
Informations sur l’immeuble
| Type de vente | Investissement ou propriétaire occupant | Sous-type de bien | Terrain industriel |
| Nb de lots | 1 | Usage proposé | Industriel/Logistique |
| Type de bien | Terrain | Surface totale du lot | 26,91 ha |
| Zonage | A-E | ||
| Type de vente | Investissement ou propriétaire occupant |
| Nb de lots | 1 |
| Type de bien | Terrain |
| Sous-type de bien | Terrain industriel |
| Usage proposé | Industriel/Logistique |
| Surface totale du lot | 26,91 ha |
| Zonage | A-E |
1 Lot disponible
Lot
| Prix | 4 162 045 € | Surface du lot | 26,91 ha |
| Prix par ha | 154 656,20 € |
| Prix | 4 162 045 € |
| Prix par ha | 154 656,20 € |
| Surface du lot | 26,91 ha |
The Deer Trail Pit is a permitted, active gravel pit located just 1.75 miles from the I-70 exit at the Town of Deer Trail and the Union Pacific Railroad.
Description
The Deer Trail Pit is a permitted, active gravel pit located just 1.75 miles from the I-70 exit at the the Town of Deer Trail and the Union Pacific Railroad. A geologic survey estimates 1.2 million cubic yards of Class 5A and other aggregate materials to be mined. The site is conveniently situated about 40 miles from the I-70/E-470 interchange and 30 miles from Limon. Contact broker for more details.
Taxes foncières
| Numéro de parcelle | 2061-00-0-00-249 | Évaluation des aménagements | 0 € |
| Évaluation du terrain | 0 € | Évaluation totale | 60 599 € |
Taxes foncières
Numéro de parcelle
2061-00-0-00-249
Évaluation du terrain
0 €
Évaluation des aménagements
0 €
Évaluation totale
60 599 €
1 sur 6
Vidéos
Visite extérieure 3D Matterport
Visite 3D
Photos
Street view
Rue
Carte
