Connectez-vous/S’inscrire
Votre e-mail a été envoyé.
2 T-Hangar Buildings | 45 Airport Way 45 Airport Way Industriel/Logistique 1 951 m² 100 % Loué À vendre Dallesport, WA 98617 1 898 314 € (973,01 €/m²)

Certaines informations ont été traduites automatiquement.
Informations principales sur l'investissement
- Brand-New Construction - Turnkey asset with zero deferred maintenance or near-term capital expenditure requirements.
- Built-In Rent Growth - 3% annual escalations provide durable income growth and inflation protection.
- Compelling Airport Fundamentals-Active regional airport with training operations, aerial firefighting, National Guard activity, and strong GA culture.
- Significant Pent-Up Demand-35+ aircrafts on the waitlist plus strong off-market leasing interest; national undersupply of General Aviation hangars.
- Long-Term Ground Lease w/ Public Airport at Below Market Rates - 20- year initial term plus 20-year option.
- Supply-Constrained, FAA-Regulated Asset Class
Résumé analytique
This rare offering consists of two newly constructed, on-airport T-hangar buildings totaling 18 units and approximately 21,000 square feet at Columbia Gorge Regional Airport (KDLS). Eleven standard hangar bays measure 42’ W x 25’ D, and seven corner units include approximately 300 additional square feet. The hangars feature sliding doors and offer direct apron and taxiway access. The asset benefits from a low-cost maintenance and operating structure, with some tenants responsible for utilities, insurance, CAM, leasehold taxes, and administrative costs, resulting in low ownership overhead.
Demand is both local and structural. Nationally, industry surveys indicate 71% of general aviation airports report shortages of individual hangars, while 55% report having land but lacking the resources to deliver new supply—creating a persistent imbalance between demand and inventory. This supply constraint is reinforced by public-airport governance and FAA policy frameworks that prioritize aeronautical infrastructure improvements over hangar construction.
Locally, KDLS and surrounding airports maintain formal waiting list processes, and aviation publications report approximately 50 pilots waiting for hangar space alongside significant interest in the 18-unit development—supporting rapid stabilization. T-hangars on publicly owned airports rarely come to market due to limited new construction, and increasing rental rates combined with long-term, low-cost ground leases position the asset for steady revenue growth over time.
Demand is both local and structural. Nationally, industry surveys indicate 71% of general aviation airports report shortages of individual hangars, while 55% report having land but lacking the resources to deliver new supply—creating a persistent imbalance between demand and inventory. This supply constraint is reinforced by public-airport governance and FAA policy frameworks that prioritize aeronautical infrastructure improvements over hangar construction.
Locally, KDLS and surrounding airports maintain formal waiting list processes, and aviation publications report approximately 50 pilots waiting for hangar space alongside significant interest in the 18-unit development—supporting rapid stabilization. T-hangars on publicly owned airports rarely come to market due to limited new construction, and increasing rental rates combined with long-term, low-cost ground leases position the asset for steady revenue growth over time.
Informations sur l’immeuble
| Prix | 1 898 314 € | Surface utile brute | 1 951 m² |
| Prix par m² | 973,01 € | Nb d’étages | 1 |
| Type de vente | Investissement | Année de construction | 2025 |
| Type de bien | Industriel/Logistique | Zone de développement économique [USA] |
Oui
|
| Classe d’immeuble | B |
| Prix | 1 898 314 € |
| Prix par m² | 973,01 € |
| Type de vente | Investissement |
| Type de bien | Industriel/Logistique |
| Classe d’immeuble | B |
| Surface utile brute | 1 951 m² |
| Nb d’étages | 1 |
| Année de construction | 2025 |
| Zone de développement économique [USA] |
Oui |
1 1
Not walkable
10/100
Exceptionally drivable
90/100
Limited public transit
30/100
Somewhat bikeable
30/100
Taxes foncières
| Numéro de parcelle | 02133400001200 | Évaluation des aménagements | 1 857 932 € |
| Évaluation du terrain | 193 896 € | Évaluation totale | 2 051 827 € |
Taxes foncières
Numéro de parcelle
02133400001200
Évaluation du terrain
193 896 €
Évaluation des aménagements
1 857 932 €
Évaluation totale
2 051 827 €
1 sur 2
Vidéos
Visite extérieure 3D Matterport
Visite 3D
Photos
Street view
Rue
Carte
1 sur 1
Présenté par
2 T-Hangar Buildings | 45 Airport Way | 45 Airport Way
Vous êtes déjà membre ? Connectez-vous
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.
