Partager cette annonce

Message

923 caractères restants

Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.

Votre e-mail a été envoyé.

Toujours intéressé ?

Contactez les agents pour obtenir plus d’informations sur cette propriété

Certaines informations ont été traduites automatiquement.

Informations principales sur l'investissement

  • 18" Natural Gas Line
  • 1 Mile of SR 60 Frontage
  • Fiber Optic Connectivity
  • TECO Confirmed Power
  • CSX Rail Access

Résumé analytique

Size: 1,000± acres; divisible to parcels of 150± acres or larger
Zoning: PD (Planned Development)
Power: TECO
Rail Access: CSX rail adjoins the property
Port Access: Approximately 15 miles from Port Tampa Bay
Targeted Uses: Manufacturing and assembly, logistics and distribution, retail, and medical/office
Frontage: More than one mile along SR 60
Road Improvements: Planned SR 60 widening project
Site Access: Additional traffic signal pending applicable approvals
Energy Uses: Approved for alternative energy production

Informations sur l’immeuble

Type de vente Investissement ou propriétaire occupant
Nb de lots 1
Type de bien Terrain
Sous-type de bien Terrain industriel
Usage proposé
Commercial
  • Industriel/Logistique
  • Local commercial
  • Bureau
  • Hôtellerie
  • Grand magasin
  • Distribution
  • Santé
  • Hôtel
  • Parc industriel
  • Médical
  • Centre de quartier
  • Centre commercial géant
  • Réfrigération ou entreposage frigorifique
  • Entrepôt commercial
  • Terminal routier
  • Entrepôt
Surface totale du lot 404,69 ha
Zonage PD - The PD (Planned Development) zoning supports unified, large-scale mixed-use development with flexible concept plans responsive to market conditions.

1 Lot disponible

Lot

Surface du lot 404,69 ha

E 1/2 LESS SR 60 AND S 3/4 OF W 1/2 LESS RR R/W'S LESS THAT PART LYING WITHIN FOLL DESC PARCEL COMM AT SW COR OF N 1/2 OF NW

Description

University Energy Park presents a rare opportunity to acquire approximately 1,000 acres of large-scale, entitled development land within Hillsborough County’s Urban Service Area. Located at 4145 E State Road 60 in the Tampa MSA, the property offers more than one mile of frontage along SR 60 and is positioned for advanced manufacturing, logistics, distribution, institutional, office, medical, hospitality, retail, and related commercial development. The approved entitlements support more than 6.1 million square feet of industrial, manufacturing, office, warehousing, and distribution uses, plus up to 350,000 square feet of retail, hospitality, medical office, and other commercial uses. The property is also approved for alternate energy production, providing additional flexibility for solar and other energy-related applications. Ownership preference is to transact on the entire site, although they may consider subdividing the site into parcels of approximately 150 acres or larger. University Energy Park is distinguished by an infrastructure profile designed to support large-scale industrial and high-demand users. An 18-inch Florida Gas Transmission high-pressure natural gas pipeline traverses the property, while TECO high-voltage transmission infrastructure is adjacent to the site. Multiple long-haul and metro fiber networks are also adjacent along the SR 60 and CSX corridors, providing access to diverse, scalable connectivity options. A CSX rail line adjoins and crosses portions of the property, creating the potential to reestablish spur connectivity for rail-served users, subject to CSX coordination and applicable approvals. The site also provides convenient connectivity to I-4, I-75, Port Tampa Bay, Tampa International Airport, and Lakeland Linder International Airport. The property currently benefits from two traffic signals serving the site which would further enhance access and traffic circulation. The planned widening of SR 60 is expected to provide additional long-term capacity along this growing industrial and employment corridor. With campus-scale acreage, flexible entitlements, multimodal transportation connectivity, utility access, fiber adjacency, and multiple energy options, University Energy Park offers a highly differentiated development platform for investors, master developers, manufacturers, logistics operators, and other large-scale occupiers.

Impraticable à pied
10/100
Exceptionnellement adapté aux voitures
100/100
Plutôt praticable en vélo
40/100

Taxes foncières

Taxes foncières

N° de parcelle
Multiple
  • U-34-29-21-ZZZ-000004-20150.0
  • U-28-29-21-ZZZ-000004-13680.1
  • U-33-29-21-ZZZ-000004-19470.0
  • U-28-29-21-ZZZ-000004-13680.0
  • U-27-29-21-ZZZ-000004-13630.0
Évaluation du terrain
86 €
Évaluation des aménagements
0 €
Évaluation totale
821 666 €
  • ID de l’annonce: 40193792

  • Date de mise sur le marché: 17/04/2026

  • Dernière mise à jour:

  • Adresse: 4145 E State Rd 60, Dover, FL 33527

Lien copié
Votre compte LoopNet a été créé !

Veuillez partager vos commentaires

Nous vous invitons à nous faire part de vos commentaires sur la façon dont nous pouvons améliorer LoopNet afin de mieux répondre à vos besoins.
X
{{ getErrorText(feedbackForm.starRating, "Ce notation") }}
255 caractères max. ({{ remainingChars() }} caractèrecaractères restantsur)
{{ getErrorText(feedbackForm.msg, "Ce notation") }}
{{ getErrorText(feedbackForm.fname, "Ce prénom") }}
{{ getErrorText(feedbackForm.lname, "Ce nom") }}
{{ getErrorText(feedbackForm.phone, "Ce numéro de téléphone") }}
{{ getErrorText(feedbackForm.phonex, "Cette extension de téléphone") }}
{{ getErrorText(feedbackForm.email, "Cet email") }}