Votre e-mail a été envoyé.
Certaines informations ont été traduites automatiquement.
Informations principales
- The property offers 100,000 square feet of new-construction industrial space delivering in Q4 2026.
- The facility includes nine dock-high doors and two drive-in doors.
- The design includes expandable 400-amp power and wide column spacing.
- The building features a 36-foot clear height and flexible office buildout.
- The site is located along the I-75 corridor with access to major Midwest markets.
Caractéristiques
Tous les espace disponibles(1)
Afficher les loyers en
- Espace
- Surface
- Durée
- Loyer
- Type de bien
- Aménagement
- Disponible
The property offers up to 100,000 square feet of new industrial space delivering in Q4 2026 with a 36-foot clear height, nine dock-high doors, two drive-in doors, and flexible office buildout options. The building is divisible and positioned along the I-75 corridor, supporting distribution and light industrial uses.
| Espace | Surface | Durée | Loyer | Type de bien | Aménagement | Disponible |
| 1er étage | 9 290 m² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel/Logistique | - | 01/01/2027 |
1er étage
| Surface |
| 9 290 m² |
| Durée |
| Négociable |
| Loyer |
| Sur demande Sur demande Sur demande Sur demande |
| Type de bien |
| Industriel/Logistique |
| Aménagement |
| - |
| Disponible |
| 01/01/2027 |
1er étage
| Surface | 9 290 m² |
| Durée | Négociable |
| Loyer | Sur demande |
| Type de bien | Industriel/Logistique |
| Aménagement | - |
| Disponible | 01/01/2027 |
The property offers up to 100,000 square feet of new industrial space delivering in Q4 2026 with a 36-foot clear height, nine dock-high doors, two drive-in doors, and flexible office buildout options. The building is divisible and positioned along the I-75 corridor, supporting distribution and light industrial uses.
Aperçu du bien
351 Commerce Parkway is a modern, new-construction industrial facility totaling 100,000 square feet in Lima, Ohio. Positioned along the I-75 corridor, the property offers efficient access to regional and national transportation routes serving major Midwest markets. The building is designed with a 36-foot clear height, flexible office buildout, and a functional layout supported by dock-high and drive-in doors. The project is expected to deliver in Q4 2026 and is well suited for distribution, logistics, and light industrial users seeking efficient operations within a competitive cost market.
Faits sur l’installation entrepôt
Présenté par
351 Commerce Pky
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.





