Votre e-mail a été envoyé.
Certaines informations ont été traduites automatiquement.
Informations principales
- Rail-served facility with two dedicated rail doors
- Ammonia refrigeration system with racking in place
- Strategic location near I-75 and major Southeastern markets
- 35 truck docks for high-volume distribution
- Clear heights ranging from 24’ to 30’ for efficient storage
Caractéristiques
Tous les espace disponibles(1)
Afficher les loyers en
- Espace
- Surface
- Durée
- Loyer
- Type de bien
- Aménagement
- Disponible
90,000 Square Feet Food Processing, 220,000 Square Feet Freezer, 20,000 Square Foot Dry Warehouse. Building owner can also provide 3PL services.
- Le loyer ne comprend pas les services publics, les frais immobiliers ou les services de l’immeuble.
| Espace | Surface | Durée | Loyer | Type de bien | Aménagement | Disponible |
| RDC | 883 – 30 658 m² | Négociable | 56,59 € /m²/an 4,72 € /m²/mois 1 734 916 € /an 144 576 € /mois | Industriel/Logistique | Construction achevée | 30 jours |
RDC
| Surface |
| 883 – 30 658 m² |
| Durée |
| Négociable |
| Loyer |
| 56,59 € /m²/an 4,72 € /m²/mois 1 734 916 € /an 144 576 € /mois |
| Type de bien |
| Industriel/Logistique |
| Aménagement |
| Construction achevée |
| Disponible |
| 30 jours |
RDC
| Surface | 883 – 30 658 m² |
| Durée | Négociable |
| Loyer | 56,59 € /m²/an |
| Type de bien | Industriel/Logistique |
| Aménagement | Construction achevée |
| Disponible | 30 jours |
90,000 Square Feet Food Processing, 220,000 Square Feet Freezer, 20,000 Square Foot Dry Warehouse. Building owner can also provide 3PL services.
- Le loyer ne comprend pas les services publics, les frais immobiliers ou les services de l’immeuble.
Aperçu du bien
Located at 302 Airport Drive in Montezuma, Georgia, this food-grade facility offers the flexibility and infrastructure needed for high-volume cold storage and distribution. Spanning up to 330,000 SF, the property combines freezer, cooler, and dry storage areas, with clear heights ranging from 24' to 30'. The building is designed for efficiency, featuring 31 dock doors, 3 closed docks, and 2 rail docks, along with direct rail access for seamless multi-modal transportation. An ammonia refrigeration system is in place to support a variety of temperature-controlled needs, and 8,000 amps of power provide capacity for heavy operations. Existing racking remains in place, allowing for immediate operational readiness. Strategically positioned just 21 miles from I-75 with access to major Southeastern markets, the facility is well suited for 3PL, food processing, and distribution users.
Faits sur l’installation réfrigération/chambre froide
Présenté par
302 Airport Dr
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.





