
Volkswagen Engineering Campus
Cette fonctionnalité n’est pas disponible pour le moment.
Nous sommes désolés, mais la fonctionnalité à laquelle vous essayez d’accéder n’est pas disponible actuellement. Nous sommes au courant du problème et notre équipe travaille activement pour le résoudre.
Veuillez vérifier de nouveau dans quelques minutes. Veuillez nous excuser pour ce désagrément.
– L’équipe LoopNet
Votre e-mail a été envoyé.
Volkswagen Engineering Campus 2 biens | Industriel/Logistique | À vendre | 44 784 490 € | Oxnard, CA



INFORMATIONS PRINCIPALES SUR L'INVESTISSEMENT
- The property is currently 100% NNN leased by Volkswagen (S&P: BBB+) through February 2033.
- HEAVY POWER: 201 Del Norte has 8,000 amps of power and 3301 Sturgis has 4,000 amps of power.
- Oxnard currently maintains a low industrial vacancy rate of just 1.5% across its 25 million square feet of inventory.
- The Volkswagen Campus serves as a pivotal facility for emissions testing and vehicle design for VW.
- Large Discount to Replacement Cost.
RÉSUMÉ ANALYTIQUE
Colliers is pleased to present the opportunity to acquire the fee-simple interest in the Volkswagen Engineering Campus, a premier two-building, 155,240-square-foot industrial/advanced manufacturing campus in Oxnard, California. Fully NNN leased to Volkswagen (S&P: BBB+), the property serves as a mission-critical facility for the company’s North American operations, specializing in emissions testing and vehicle design.
201 Del Norte Boulevard comprises 65,429 square feet and operates as Volkswagen’s only emissions testing facility in the United States. Purpose-built for the company in 2012, the building features many specialized improvements with significant tenant investment. Oxnard’s moderate climate and ideal elevation make it a strategic choice for testing.
3301 Sturgis Road spans 89,811 square feet and serves as the Design Center California. Design Center California is a dedicated Volkswagen brand studio that develops Volkswagen concepts exclusively for the North American market and ensures effective collaboration within the region and with Volkswagen AG in Wolfsburg, Germany. The building also supports marketing functions, vehicle storage, and on-site testing of new and legacy models, playing a key role in product development. Recently, the company extended its lease in the building through February 2033, emphasizing its commitment to the project.
This is an integral campus for Volkswagen’s operations in North America that encompasses Volkswagen Test Center along with VW quality and Audi engineering and home of the Design Center, and advancing sustainable automotive technologies. Volkswagen has nearly eight years of remaining term, and two 10-year renewal options, providing a secure income stream from an investment grade credit tenant.
201 Del Norte Boulevard comprises 65,429 square feet and operates as Volkswagen’s only emissions testing facility in the United States. Purpose-built for the company in 2012, the building features many specialized improvements with significant tenant investment. Oxnard’s moderate climate and ideal elevation make it a strategic choice for testing.
3301 Sturgis Road spans 89,811 square feet and serves as the Design Center California. Design Center California is a dedicated Volkswagen brand studio that develops Volkswagen concepts exclusively for the North American market and ensures effective collaboration within the region and with Volkswagen AG in Wolfsburg, Germany. The building also supports marketing functions, vehicle storage, and on-site testing of new and legacy models, playing a key role in product development. Recently, the company extended its lease in the building through February 2033, emphasizing its commitment to the project.
This is an integral campus for Volkswagen’s operations in North America that encompasses Volkswagen Test Center along with VW quality and Audi engineering and home of the Design Center, and advancing sustainable automotive technologies. Volkswagen has nearly eight years of remaining term, and two 10-year renewal options, providing a secure income stream from an investment grade credit tenant.
INFORMATIONS SUR L’IMMEUBLE
Prix | 44 784 490 € | Nb de biens | 2 |
Prix/m² | 3 105 € / m² | Individuellement en vente | 0 |
Taux de capitalisation | 6 % | Surface totale de l’immeuble | 14 422 m² |
Type de vente | Investissement | Surface totale du terrain | 3,77 ha |
Statut | Actif |
Prix | 44 784 490 € |
Prix/m² | 3 105 € / m² |
Taux de capitalisation | 6 % |
Type de vente | Investissement |
Statut | Actif |
Nb de biens | 2 |
Individuellement en vente | 0 |
Surface totale de l’immeuble | 14 422 m² |
Surface totale du terrain | 3,77 ha |
Biens
NOM DU BIEN/ADRESSE | TYPE DE BIEN | SURFACE | ANNÉE DE CONSTRUCTION | PRIX INDIVIDUEL |
---|---|---|---|---|
3301 Sturgis Rd, Oxnard, CA 93030 | Industriel/Logistique | 8 344 m² | 2003 | - |
201 Del Norte Blvd, Oxnard, CA 93030 | Industriel/Logistique | 6 079 m² | 2012 | - |
1 of 1
1 de 11
VIDÉOS
VISITE 3D
PHOTOS
STREET VIEW
RUE
CARTE
1 of 1
Présenté par

Volkswagen Engineering Campus
Vous êtes déjà membre ? Connectez-vous
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.