Connectez-vous/S’inscrire
Votre e-mail a été envoyé.
WNC Energy Site 199 Cline Pk ct Lot | Terrain industriel | 7,85 ha | À vendre | 7 295 975 € | Hildebran, NC 28637


Certaines informations ont été traduites automatiquement.
INFORMATIONS PRINCIPALES SUR L'INVESTISSEMENT
- Adjacent to Duke Energy Tie Station
- Graded site with retention in=plce
- Surrounded by Cyprus Creek/Cline Solar Farm
RÉSUMÉ ANALYTIQUE
Adjacent to Duke Energy Longview Tie Station with large potential service capacity in excess of 60 MW, with growth to 200 MW.
TAXES ET FRAIS D’EXPLOITATION (RÉEL - 2025) |
ANNUEL | ANNUEL PAR ha |
|---|---|---|
| Taxes |
1 382 €
|
176,02 €
|
| Frais d’exploitation |
-
|
-
|
| Total des frais |
1 382 €
|
176,02 €
|
TAXES ET FRAIS D’EXPLOITATION (RÉEL - 2025)
| Taxes | |
|---|---|
| Annuel | 1 382 € |
| Annuel par ha | 176,02 € |
| Frais d’exploitation | |
|---|---|
| Annuel | - |
| Annuel par ha | - |
| Total des frais | |
|---|---|
| Annuel | 1 382 € |
| Annuel par ha | 176,02 € |
INFORMATIONS SUR L’IMMEUBLE
| Prix | 7 295 975 € | Sous-type de bien | Terrain industriel |
| Type de vente | Propriétaire occupant | Usage proposé |
|
| Nb de lots | 1 | Surface totale du lot | 7,85 ha |
| Type de bien | Terrain | Zone de développement économique [USA] |
Oui
|
| Zonage | G-M General Manufacturing - General Manufacturing. | ||
| Prix | 7 295 975 € |
| Type de vente | Propriétaire occupant |
| Nb de lots | 1 |
| Type de bien | Terrain |
| Sous-type de bien | Terrain industriel |
| Usage proposé | |
| Surface totale du lot | 7,85 ha |
| Zone de développement économique [USA] |
Oui |
| Zonage | G-M General Manufacturing - General Manufacturing. |
1 LOT DISPONIBLE
Lot
| Prix | 7 295 975 € | Surface du lot | 7,85 ha |
| Prix par ha | 929 316,83 € |
| Prix | 7 295 975 € |
| Prix par ha | 929 316,83 € |
| Surface du lot | 7,85 ha |
Located in Cline Industrial Park, surrounded on 3 side by solar farm and adjacent to Duke Energy Longview Tie Station with large potential service capacity in excess of 60 MW, with growth to 200 MW.
DESCRIPTION
Originally graded for house truss mfg operation, retention ponds in-place, and adjacent to large Duke Energy Tie Station near Hickory, NC.
1 of 1
1 de 3
VIDÉOS
VISITE 3D
PHOTOS
STREET VIEW
RUE
CARTE
1 of 1
Présenté par
WNC Energy Site | 199 Cline Pk ct
Vous êtes déjà membre ? Connectez-vous
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.

