Connectez-vous/S’inscrire
Votre e-mail a été envoyé.
Industrial Datacenter 150 Don Bates Way Industriel/Logistique 5 110 m² 100 % Loué Immeuble 4 étoiles À vendre King City, CA 93930



Certaines informations ont été traduites automatiquement.
Informations principales sur l'investissement
- Power-ready campus with 8.31 MW of onsite electrical capacity and infrastructure for scalable growth.
- Four dedicated power corridors with 2,500-amp transformers and switchgear; two fully operational and two pre-engineered.
- Located 90 minutes from Silicon Valley with lower operating costs and direct proximity to the city’s power generation facility.
- Five existing buildings totaling approximately 55,000 SF, with approved plans for an additional 54,000 SF.
- Fiber connectivity from AT&T with infrastructure stubbed for additional carriers.
Résumé analytique
150 Don Bates Way offers a rare opportunity to acquire a power-ready data center campus in King City, California, strategically located approximately 90 minutes south of Silicon Valley.
Positioned on 4.2 acres, the property includes five existing buildings totaling approximately 55,000 square feet, with approved plans for an additional 54,000+ square feet of expansion. This configuration provides immediate scalability for operators or investors seeking to deploy significant computing capacity within an already entitled campus footprint.
The site is designed for high-density computing and mission-critical operations, supported by 10,000 amps of 480-volt three-phase power and delivering 8.31 megawatts of total onsite electrical capacity. Approximately half of this power is currently utilized, with the remaining capacity available through active switchgear and transformer infrastructure. The electrical system spans four dedicated power corridors, each equipped with 2,500-amp transformers and switchgear, two of which are fully operational and two pre-engineered, "hot", and for ready deployment.
Connectivity is ensured through AT&T fiber infrastructure, with additional communications conduits in place for future carriers. Located directly across from the city’s power generation plant, the property benefits from reliable local grid access and lower operating costs compared to Bay Area markets. Delivered fully secured, gated, and 100% vacant at close of escrow, this campus represents a turnkey solution for hyperscale users, colocation providers, or investors seeking a scalable Northern California data center platform.
3/26/26
From ATT Regarding the Fiber Optic Line Splicing:
""150 Don Bates way, King City CA 93930: Data Center
Great News regarding the Fiber in King City specifically for the Address above:
The distance to a splice is 2100 ft. and the estimated construction is $55,000. The path would be determined if contract was signed and construction was started.
We install regularly up to 100Gbps with a business case that makes sense. Increases will considered upon request..
We have a 100% uptime guarantee with 4 hour mean time to RESTORE services if something were to go out. As well as 24/7/365 day a year US based support for the services
We can do redundancy but that would be a separate path. We take redundancy very seriously and would build a solution with you
It is single mode as a standard but we can go multi-mode upon request. We can do optic or fiber as well for transport.""""
Positioned on 4.2 acres, the property includes five existing buildings totaling approximately 55,000 square feet, with approved plans for an additional 54,000+ square feet of expansion. This configuration provides immediate scalability for operators or investors seeking to deploy significant computing capacity within an already entitled campus footprint.
The site is designed for high-density computing and mission-critical operations, supported by 10,000 amps of 480-volt three-phase power and delivering 8.31 megawatts of total onsite electrical capacity. Approximately half of this power is currently utilized, with the remaining capacity available through active switchgear and transformer infrastructure. The electrical system spans four dedicated power corridors, each equipped with 2,500-amp transformers and switchgear, two of which are fully operational and two pre-engineered, "hot", and for ready deployment.
Connectivity is ensured through AT&T fiber infrastructure, with additional communications conduits in place for future carriers. Located directly across from the city’s power generation plant, the property benefits from reliable local grid access and lower operating costs compared to Bay Area markets. Delivered fully secured, gated, and 100% vacant at close of escrow, this campus represents a turnkey solution for hyperscale users, colocation providers, or investors seeking a scalable Northern California data center platform.
3/26/26
From ATT Regarding the Fiber Optic Line Splicing:
""150 Don Bates way, King City CA 93930: Data Center
Great News regarding the Fiber in King City specifically for the Address above:
The distance to a splice is 2100 ft. and the estimated construction is $55,000. The path would be determined if contract was signed and construction was started.
We install regularly up to 100Gbps with a business case that makes sense. Increases will considered upon request..
We have a 100% uptime guarantee with 4 hour mean time to RESTORE services if something were to go out. As well as 24/7/365 day a year US based support for the services
We can do redundancy but that would be a separate path. We take redundancy very seriously and would build a solution with you
It is single mode as a standard but we can go multi-mode upon request. We can do optic or fiber as well for transport.""""
Data room Cliquez ici pour accéder à
Informations sur l’immeuble
| Type de vente | Investissement | Surface du lot | 1,7 ha |
| Type de bien | Industriel/Logistique | Surface utile brute | 5 110 m² |
| Sous-type de bien | Centre de données | Nb d’étages | 1 |
| Classe d’immeuble | B | Année de construction/rénovation | 2020/2026 |
| Type de vente | Investissement |
| Type de bien | Industriel/Logistique |
| Sous-type de bien | Centre de données |
| Classe d’immeuble | B |
| Surface du lot | 1,7 ha |
| Surface utile brute | 5 110 m² |
| Nb d’étages | 1 |
| Année de construction/rénovation | 2020/2026 |
1 1
Plutôt praticable à pied
30/100
Exceptionnellement adapté aux voitures
100/100
Transports en commun très limités
10/100
Plutôt praticable en vélo
40/100
Taxes foncières
| Numéro de parcelle | 026-521-010-000 | Évaluation des aménagements | 7 764 457 € |
| Évaluation du terrain | 6 367 926 € | Évaluation totale | 14 132 382 € |
Taxes foncières
Numéro de parcelle
026-521-010-000
Évaluation du terrain
6 367 926 €
Évaluation des aménagements
7 764 457 €
Évaluation totale
14 132 382 €
1 sur 5
Vidéos
Visite extérieure 3D Matterport
Visite 3D
Photos
Street view
Rue
Carte
1 sur 1
Présenté par
Anderson Realty
Industrial Datacenter | 150 Don Bates Way
Vous êtes déjà membre ? Connectez-vous
Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.
Merci ! Votre message a été envoyé.
