Partager cette annonce

Message

950 caractères restants

Hum, une erreur s’est produite lors de l’envoi de votre message. Veuillez réessayer.

Votre e-mail a été envoyé.

Toujours intéressé ?

Contactez les agents pour obtenir plus d’informations sur cette propriété

Certaines informations ont été traduites automatiquement.

Informations principales sur l'investissement

  • Ample Parking Available
  • Easy Access & Egress to Deerfoot Trail, Barlow Trail
  • Quick Access to Transit Routes

Résumé analytique

The unit at Douglasdale Professional Centre is one of the premier units in the development. The north half of the development was completed in 2008 and the south half (Phase II), where the subject unit is located, was developed in 2015. This unit is one of only two corner units on the top floor of Phase II that is west facing offering spectacular mountain views. The interior of the unit is efficiently designed for no wasted space and is being offered fully furnished for immediate move in. Three of the individual offices are leased by a third party on a month to month basis offering a potential purchaser the ability of built in growth with interim cash flow until such time as the entirety of the unit is required.

Informations sur l’immeuble

Surface totale de l’immeuble 9 436 m²
Type de bien Bureau (Lot en copropriété)
Sous-type de bien Médical
Classe d’immeuble B
Étages 3
Surface type par étage 3 145 m²
Année de construction 2008
Surface du lot 0,81 ha
Ratio de stationnement 0,17/1 000 m²
Zonage I-B - Entreprise industrielle

Caractéristiques

  • Atrium
  • Ligne d’autobus
  • Accès contrôlé
  • Signalisation
  • Chauffage central
  • Lumière naturelle
  • Éclairage encastré
  • Panneau monumental
  • Climatisation
  • Détecteur de fumée

1 Lot disponible

Lot 208

Surface du lot 273 m²
Prix 618 641 €
Prix par m² 2 267,28 €
Usage du lot en coprop. Bureau
Type de vente Investissement
Nb de places de stationnement 286
Description

2,937 SF Rentable Equivalent (2,610 SF Usable / Condo Plan)

Notes sur la vente

Unit 208 at Douglasdale Professional Centre is one of the premier units in the development. The building offers excellent access through its proximity to Deerfoot Trail, Glenmore Trail, and is situated adjacent to the Douglas Glen Park and Ride which is serviced by the MAX Teal Line. The north half of the development was completed in 2008, where the subject unit is located, and the south half (Phase II) was developed in 2015.  This unit offers excellent natural light as a corner unit on the northeast side of the building.  The interior of the unit is built out with full glass offices and is being offered fully furnished for immediate move in.  The space features a reception area, boardroom, kitchenette, storage room, in addition to the 8 offices throughout the space

Fairly walkable
40/100
Exceptionally drivable
100/100
Some public transit
50/100
Moderately bikeable
60/100
  • ID de l’annonce: 38938769

  • Date de mise sur le marché: 31/12/2025

  • Dernière mise à jour:

  • Adresse: 11420 27th St SE, Calgary, AB T2Z 3R6

Lien copié
Votre compte LoopNet a été créé !

Veuillez partager vos commentaires

Nous vous invitons à nous faire part de vos commentaires sur la façon dont nous pouvons améliorer LoopNet afin de mieux répondre à vos besoins.
X
{{ getErrorText(feedbackForm.starRating, "Ce notation") }}
255 caractères max. ({{ remainingChars() }} caractèrecaractères restantsur)
{{ getErrorText(feedbackForm.msg, "Ce notation") }}
{{ getErrorText(feedbackForm.fname, "Ce prénom") }}
{{ getErrorText(feedbackForm.lname, "Ce nom") }}
{{ getErrorText(feedbackForm.phone, "Ce numéro de téléphone") }}
{{ getErrorText(feedbackForm.phonex, "Cette extension de téléphone") }}
{{ getErrorText(feedbackForm.email, "Cet email") }}